Exterior Renovation Order: What Gets Done First and Why

In what order should exterior work be done on a house?
Work from the top down: roof and roof-edge details first, then gutters and flashing, then siding and trim, and the deck last or in coordination with the siding. Water runs downhill, so each layer has to overlap the one below it. Doing siding before the roof forces crews to cut into finished work.
Homeowners often plan a full exterior update in pieces, spread over several years. The order matters more than the calendar, because several of the most failure-prone details sit where two trades meet.
Why does the roof go before the siding?
The roof meets walls in several places, and the flashing at those joints has to be tied into both. The U.S. Department of Energy’s Building America Solution Center explains that step flashing at roof-wall intersections should reach at least 4 inches up the wall and 4 inches out along the roof deck, with each piece overlapping the one beneath it.
Siding then goes over the step flashing, finishing at least 1 inch above the roof surface on new work. The same guide gives a 0.75 to 1.5 inch gap for retrofits. House wrap should overlap the flashing, because layering the wrap underneath lets water run behind it.
Put the siding on first and a roofer replacing shingles later has to pry up finished boards to reach the flashing. Put the roof on first and the wall covering can be built to shed water over the metal.
Where do gutters and kick-out flashing fit in?
Gutters follow the roof edge, and the kick-out flashing connects the two. A kick-out is a diverter at the bottom of a roof-to-wall joint that sends runoff into the gutter instead of down the siding. The Building America guide says it should be large enough for expected stormwater flows, fastened to the roof deck and starter strip rather than the sidewall, and set so the gutter end leaves a small gap from the wall.
The same page warns that undersized or poorly sealed diverters can send water into the wall cavity. Newer claddings such as fiber cement and vinyl can hide that damage for years.
If a house has an old gutter system, the gutters and the roof edge should be planned together. Our seamless gutter service page covers the system itself; the sequencing point is that gutters hang from the fascia, so any rotted fascia has to be fixed before new gutters go up.
What does siding need at the bottom of the wall?
Siding needs base flashing and clearance from the ground. The Building America resource on flashing at the bottom of exterior walls puts the bottom edge of base flashing at least 8 inches above grade and recommends the soil slope away from the house at about 5 percent, roughly 5/8 inch per foot.
It also describes the goal as “deflect, drain, and dry”. Water behind cladding is expected, so the wall has to let it out. A gap of about 1/16 inch behind lap siding, 3/4 inch behind stucco and 1 inch behind brick supports that drainage.
For wood or fiber-cement walls, the guide calls for metal or vinyl base flashing on the sheathing, with a drip edge and overlaps of at least 8 inches. This flashing is invisible in a finished photo, which is why it is worth asking about. Our pages on fiber cement siding and vinyl siding cover product choices.
A sequencing table for a full exterior update
| Stage | Main task | What it protects | Check before moving on |
|---|---|---|---|
| 1. Decking and roof | Replace damaged roof sheathing, underlayment, shingles | Attic and framing | Soft decking replaced, drip edge installed |
| 2. Roof-wall joints | Step flashing and kick-outs | Wall cavity | Flashing lapped correctly, kick-out sized for flow |
| 3. Fascia and gutters | Repair fascia, hang gutters and downspouts | Siding, trim, foundation | Slope toward downspouts, end gap at wall |
| 4. Walls | Water-resistive barrier, siding, trim | Sheathing and insulation | Base flashing above grade, barrier laps shingled |
| 5. Deck | Repair, refinish, or new framing tied to the wall | Rim area and ledger zone | Flashing integrated with the finished wall |
If your budget forces phases, rank them by water entry. An open roof leak or failed flashing outranks a faded wall color.
Where does the deck go in the plan?
Decks go last unless they attach to the house. A deck fastened to the wall has to be flashed into the water-resistive barrier, so its location has to be settled before the siding is finished. Replacing siding and then cutting it open for a deck ledger repeats work.
Lifespan also drives timing. The National Association of Home Builders’ 2007 Study of Life Expectancy of Home Components puts wooden decks at about 20 years under ideal conditions, and it notes that climate swings can shorten that.
New Jersey’s Department of Community Affairs treats repair or replacement of deck parts that do not support a roof or part of the building as ordinary maintenance, per its 2018 ordinary maintenance table. A new deck is different, so ask your town’s construction office. Our deck repair page and the Hidalgo Brothers crew handle repairs, refinishing and new builds.
What does northern New Jersey weather do to the schedule?
Northern New Jersey has a shorter working season than the rest of the state. The Office of the New Jersey State Climatologist at Rutgers puts the average number of freeze-free days in the northern highlands at 163, with the last killing spring frost around May 4 and the first fall frost around October 7. Annual snowfall averages 40 to 50 inches in the northern zone.
In practice, that points most exterior work toward the stretch between spring and the first fall frosts. Plan the roof and flashing early in the season, because wall and deck finishes can be built afterward. The Rutgers New Jersey climate overview is the source for these figures.
What do before-and-after photos leave out?
A before-and-after photo shows paint and profiles but not the layers underneath. When you compare projects or ask for references, request progress photos of the hidden stages: bare decking, underlayment, flashing at the walls and the barrier before siding.
Our process has five steps: a free estimate with an on-site inspection, planning around your household, installation to code and manufacturer specifications, cleanup and a walkthrough, and ongoing support. If a detail on the finished job looks wrong, we want to hear from you.
To plan a multi-part project in Wharton or nearby, see the Wharton service page, then use our free estimate form. A comparison of materials is available in fiber cement versus vinyl siding for New Jersey homes.
Frequently asked questions
Can siding and a roof be replaced at the same time?
Yes, and it is often efficient because the crews can build the flashing between them once. The roof section should be completed first at each joint so the siding laps over the flashing. A single written scope should describe where each trade ends.
Do gutters go on before or after new siding?
Gutters hang from the fascia and roof edge, so they come after roof work and fascia repair. Kick-out flashing must be planned with the roof, so the roof-edge and gutter details are settled together. Settle the order in the written scope.
Why is there a gap between siding and the roof?
The gap keeps water from wicking up into the boards and gives the flashing room to work. Building America guidance calls for siding to end at least 1 inch above the roof surface on new work, and 0.75 to 1.5 inches on retrofits.
How high should siding sit above the ground?
The Building America guide puts the bottom edge of base flashing at least 8 inches above grade, with soil sloping away from the house at roughly 5 percent. Check local code and the product manufacturer’s instructions, since specific siding products can have their own clearance rules.
Does exterior work in New Jersey need a permit?
For detached one- and two-family homes, the state classifies reroofing and siding repair or replacement as ordinary maintenance, so no permit is required, though the work still has to meet code. New decks, attached housing and structural work differ, so confirm with your town.
Sources and further reading
- U.S. DOE Building America Solution Center: Step and Kick-Out Flashing at Roof-Wall Intersections (accessed 2026-11)
- U.S. DOE Building America Solution Center: Flashing at Bottom of Exterior Walls (accessed 2026-11)
- Rutgers Office of the NJ State Climatologist: The Climate of New Jersey (accessed 2026-11)
- NAHB: Study of Life Expectancy of Home Components (2007) (accessed 2026-11)
- NJ DCA: Significant Changes to Minor Work and Ordinary Maintenance (2018) (accessed 2026-11)